All articles

The "Chernobyl" museum has completed the first phase of restoration work following the missile strike.

The "Chernobyl" museum has completed the first phase of restoration work following the missile strike.

In Kyiv, work has been completed on part of the urgent repairs to the National "Chernobyl" Museum, which was damaged by a Russian missile in May. Specifically, damaged areas have been reinforced, a protective tent has been installed over the roof, and part of the heating system has been restored. The museum is now preparing for the next phase of repairs.

In Kyiv, the National "Chernobyl" Museum is being restored, which was damaged in a Russian missile strike in May. According to information posted on the museum's Facebook page, the initial work necessary to preserve the building has now been completed.

Experts conducted comprehensive engineering and design studies to assess the technical condition of the building and determine the necessary measures for its restoration. A protective metal structure with scaffolding was installed, and a tent-like roof covering was set up to protect damaged areas from rain and snow.

In addition, it was possible to restore the operation of a significant part of the heating system, which will allow for the gradual drying of the walls, which became heavily saturated during the fire and due to the ingress of rain inside the building.

Currently, the museum is preparing for the next stage of restoration. The process of procuring services for the development of scientific and project documentation is underway. This documentation will define the technical solutions, scope, and sequence of future repair and restoration work. The museum notes that the path to full restoration will be challenging, but the work completed so far helps to preserve the building and prevent further damage. The goal is to restore the museum to full operation.